Only the cab to shot blast and paint now all other items ready, new wheels are on and all oils and belts changed, new turbo , injectors, speedo cable plus many other bits. I am hoping to get cab done this week and the 3 step units in place. The steps are made and painted and have non slip tape on the steps and I used the cnc plasma to cut unimog into the back of the steps (it helps to have a major manufacturing workshop!).
I am also busy designing and manufacturing cat 3 front and rear linkages and pickup hitches. This mog has to be ready for September as I want it on our stand at the apf show